STEP 1: Select Vehicles to Compare
VS
STEP 2: Select an Electric Rate Plan
This Program is available to school districts in Missouri within the Liberty service area who take service NS-GS, TC-GS, NS-LG, TC-LG, NS-SP or TC-SP, and who currently own or lease electric school buses. You must own or lease electric school buses in number, existing or ordered, at least equal to the total number of charging ports in the EV Charging Station(s) for which you are applying.

Select the plan that applies to your school.
STEP 3: Configure Charging Equipment and Schedule
Use the tools below to optimize charging costs based on rate schedules, charging equipment and vehicle availability requirements. This tool assumes your charging infrastructure will be separately metered. Results may vary substantially if you have additional facilities load on a shared meter.

Fuel Cost Summary
EV Annual Cost
_ /year
Gas/Diesel Annual Cost
_ /year
Annual Savings
_ /year
Calculation Details
_ Reduction
Total kWh _ kWh
Max Demand _ kW

*Disclaimer: This tool is only intended to provide an estimate of potential savings. Actual results will vary. Customers may not realize similar energy savings or carbon emission reductions. Vehicle data is subject to change without notice. These are estimated electricity rates for the utility. Rates may not include tiered or time-of-use charges. Rates change periodically. Utility does not warrant or represent that this data is accurate. In no event shall the utility or its suppliers be liable for any special, indirect or consequential damages or any damages whatsoever, including, but not limited to claims associated with the accuracy of this data or information.